Reimagine

Reimagine

Imagine what God can do through our church. Imagine what God can do through you.

Artist rendering This is challenge Pastor Robby gave to our people three years ago as we launched the Imagine Campaign. Through this campaign, we developed and provided resources for a growing Guest Engagement team, retired the debt on the Coleman Center, renovated the first floor of the East Wing, and developed a master plan for the renovation of our campus. Now, we Reimagine what God can do through our church. The master plan is complete. It is now time to see what the leadership of the church believes is God’s plan for us - a plan that will position our facilities to effectively reach this generation and the generations to come for the cause of Christ. This isn’t about a building; it’s about people. It’s about creating an environment that invites and supports, where people can come to worship and be discipled. Let’s Reimagine together what God can do.

Important Dates

January 31, 7:00 PM - Town Hall Meeting (Sanctuary Lobby)
February 7, 7:00 PM - Town Hall Meeting (Sanctuary Lobby)
February 11, 4:30 PM - Town Hall Meeting (Sanctuary Lobby)
February 18, Following 10:50 AM Worship Service - Church votes whether to proceed with project

Download the complete Reimagine Booklet for all the details!

Reimagine Booklet Reimagine Booklet (8224 KB)

Watch a 5-minute summary of the proposed renovation strategy:

Vision Sunday 2018

 

Watch the complete presentation from our Pastor:

Vision Sunday 2018 Service


Questions and Answers from the Town Hall Meetings

Q: Where is the handicapped seating going to be in the Auditorium?
A: There will absolutely be handicapped seating, but we don’t have specific rows and sections decided yet because we are not far enough along in the project to answer that specifically. It’s being designed in mind of those with limitations and handicaps. There will be theater/stadium seating and there will be more space for movability than what we currently have between the pews as well as more space in the aisles. One of the advantages of the new seating is that the seats pop up automatically when someone moves.

Q: Will there be armrests on the chairs?
A: If there are armrests, they will be the fold up type so that if some were in a wheelchair and needed to scoot across several seats, they could do so. We are also looking at leaving a space along the back wall that would be wheelchair accessible. Seating will be arranged in sections so that there is not just a solid row of seating to the back of the building.

Q: Has there been consideration of special monitors for those who are sight impaired as well as a sound system for those who are deaf or hard of hearing?
A: We have not gotten far enough along in planning to have the specifics on screens and monitors but that is a great thought and will be considered when we get to that point. We will be keeping a list of these things that are brought up in the Town Hall Meetings that can be discussed as we get further along in the planning process.

Q: How much room will Choir, and Orchestra take up on the stage?
A: Current choir risers which are concrete will remain. The difference will be that the main stage/platform will be one level up to where the choir risers begin. Retractable choir risers were investigated but were way out of our cost range. There will be a modesty rail that will be retractable if we need to take it out for special events.

Q: How much space will the choir and orchestra rooms take away from the lower floor of the Auditorium?
A: It will take only a small portion of the lower floor space. It is about 2 feet in from where the balcony ledge is now. This area will be enclosed on each side for Choir and Orchestra. The seating footprint will be reduced slightly but by using the theater type seating arrangement it will make the Auditorium feel fuller on lower attendance days. *visual on screen was used for clarificationThe size of both the choir room and orchestra room will be very similar to the size of the current choir room. It won’t be a huge space but will be sufficient for the size of our choir as well as the GCA choir, with room for some growth.

Q: Will we have the same existing slope in the Auditorium?
A: Yes, that will not change.

Q: Will the balcony change?
A: The physical footprint of the risers in the balcony will not change. The pews will be changed to stackable, interlocking chairs. These will be the chairs that we use during the renovation when we will have to move the services to the Gym.

Q: Will the railing be changed in the balcony?
A: We are looking at several options for railings, but it will be changed to something that you can see through for better viewing.

Q: Are we going to be able to address the exterior skin of the Auditorium and the East Wing?
A: Partially. We will be addressing the major portions of the exterior that are failing which are the lobby, front porch and the sides up to the circular portion of the Auditorium. The columns will also be faced with brick as well. This is all that we can afford to do in this phase of the project. *visual on screen was used for clarification

Q:Regarding Bridges Building – Since the buildings will be completely separated from the parents, what mechanisms are going to be put in place to reduce the opportunity that an aggressor might use to take advantage of somebody (a youth)? Have you considered putting cameras in and live feed into the main building?
A: We are currently investigating security measures. Our desire is to update security on the entire campus if we can do so within our budget. There will be no offices in that building, our current policies are set for no staff member or youth worker to be with kids alone in rooms.

Q: Are the restroom facilities in Bridges Building going to be sufficient in size?
A: The restrooms as currently diagrammed to meet the requirements of the building, but it is something that we can investigate as we get further down the road in the planning stages. If we made changes to the current diagrams, there would not be a significant change in price. We are open to your perspectives and feed back and will bring it up with the architects.

Q: Who gave you the price quote on the construction?
A: The architectural firm is a design bid company who has come up with target prices. The entire project will be put out for a final bid once we’re ready to pull the trigger on the project.

Q:Have you considered an elevator for Auditorium Building or lift chairs?
A: We did look into elevators. Building Code on a remodel does not require that we add an elevator. The Master Plan that was presented on Vision Sunday, January 21, 2018, was Phase One. There is a Phase 2, 3 and 4 components to this in the future (more than 5 years away) where we would address adding an elevator.

Q: Regarding Bridges Building - What is the space between the Café & Game room? *Visual on screen was used for clarification
A: It is an additional area of seating as well as a pass-through area from Lobby to the Worship area.

Q: Are we keeping the Organ?
A: Yes, because we are hoping to gain an organ player at some point.

Q: Is the sound cloth going to remain?
A: No, the sound cloth will be removed and replaced.

Q: Re: Bridges Building – Did you consider putting a hallway in Game room leading to Worship area, entry way in the case of a funeral, since it may seem inappropriate to carry a casket through a game room?
A: This has been discussed at length but not decided. Ryan Johnston explained that the space in the Bridges Building is being designed with very neutral finishes so that they will be able to create the environmental mood that is desired for the specific event by using environmental projection that will be available. Kyle Johnson suggested adding a double door to the worship area to allow for casket entrance. This may be a better solution than adding a hallway.

Q: Regarding Bridges Building - Will patio area be enclosed?
A: We are looking into having the patio area covered and fenced in, but it will not be completely enclosed.

Q: Dorothy Justus: Are you going to change the Counseling Room from their current 3 stall design?
A: The plan is to use the Choir and Orchestra practice rooms that are easily accessible from the Auditorium? We can also use the backstage/green room area.

Q: Are choir & orchestra rooms going to be sound proofed enough to absorb all the sound?
A: There will be sound proofing, but it will not completely absorb all the sound from going into the auditorium. It will be enough that it should not be too distracting.

Q: If no elevator, can the stairs be changed up to the balcony?
A: It would not be cost effective at this point to change out those steps.

Q: Can the side stairs up to the platform be changed for those who physically have a hard time with stairs?
A: After the renovations, it will all be leveled to where orchestra will not have to go up steps to get onto the stage and the choir will only have a few steps to get to the choir risers.

Q: After the original offering, what kind of loan balance are you hoping to start with?
A: We have put a 5-million-dollar cap on this project and our goal, Lord willing, is to pay it off in 3-years of commitments. That may be a stretch for our church unless people really step up with some significant offerings that we have not experienced here in years past.

Q. Are you going to get a 6-year loan and hope to pay it off sooner or a 3-year loan and then re-qualify?
A: With interest rates currently being historically low, we are planning on a 15-20 year note to give ourselves as much leeway as possible. If we raise 2.5 million in a 3-year period, we would have a balance of 3.2 million to permanently finance. At a 5% interest rate, the payment would be $22,000 per month.

Q: Would there be a pre-payment penalty?
A: No, we would not sign a loan that requires a penalty to pre-pay.

Q: Would you consider doing a fundraiser where families could buy bricks to memorialize a loved one?
A: We are open to talking about anything regarding fundraising. If the Church votes affirmative on moving forward on this renovation, we will have several phases to move forward through before we start fundraising. Fundraising would not start until we start the construction phase and we will be open to looking to anything that is ethical that will help us meet this goal.

Q: During the time that we will be in the Gym due to construction in the auditorium, will we need additional staffing to help with set up and tear down of the gym?
A: Yes, and we have built that in to the proposed cost for construction. We will need to hire some part-time staff that specialize in set up and tear down, but we do not want to burn them out. We are considering some other options as to where we may meet, as in homes or other locations, on some Sunday nights so that the gym doesn’t have to be set up every week.

Q: Is there going to be someone overseeing communication to help guide people with questions as to what doors will be accessible so there is no confusion?
A: We will be doing our best to communicate during the construction phase especially on the things that are pre- planned, but I hope the church will be flexible during that time.

Q: Can we absentee vote since we will be out of town on the day of the vote?
A: No, our Church constitution will not allow it. You must be here to vote.

Q: Are we going to reach out to those who vote no?
A: It will be secret ballot voting, so we will not know which people vote for or against. Ron Richey added that we need to think unity no matter what the votes are. We want you to vote your conviction, but no matter what anyone votes, there needs to be unity. Pastor Robby encouraged everyone to pray for a spirit of unity around our church. Pray for God to make it very clear and that we would have a large majority vote either way.

Q: Where is the main entrance into the Bridges?
A: There are three main entrances South entrance by game room North – café entrance West – In front on patio

Questions from Town Hall Meeting #2 (February 7, 2018)

Q: Is this project going to require fire sprinklers?
A: No because at this point the percentage of change in the building does not require it. We have researched it and we have it in writing from the City that it will not be required. To qualify that statement, we have learned from experience that the Fire Marshal can come in and change anything at any time, but at this time we have been told that it is not required.

Q: If this renovation is voted down, do we have a backup plan to fix what is in desperate need of repair?
A:Yes. If this does not get voted in, we will regroup, we will meet with the leadership team and then go back to the drawing board. We will then come back to the Church and present a new plan. It still will cost several million dollars to do those repairs and some repairs would have to start this Spring.

Q: Are we changing out the parking lot lights to brighten up the lot?
A: We will be changing out all lights to LED lights in the parking lot, as well as adding more poles to brighten the the parking lots. The display does not necessarily reflect the locations of where the light poles will be placed. *visual on screen was used for clarification

Q: Is the second level, where the cross will be located, going to be available to use for extra space?
A: That space will be available for more square footage. As we get further into the bidding process that will be decided, but it will be constructed to where if we want to use that space we can.We plan on using it for storage since it will have very high ceilings. It will be accessible from the balcony on the side where the men’s bathrooms are located.

Q: Will the leaking in the Gym be addressed?
A:There was a new coating put on the roof back in October or November.Most of the leaks have been taken care of but there are a few more leaks that will be addressed by the same company that did the coating back in the fall. The roof should be good for at least another 10 years.

Pastor Robby shared additional information about renovations that we want to do inside the gym. It will happen in two phases. The first phase will be taken care of by the Church and in the second phase, we will ask school parents to help raise money.

Phase 1 – Adding insulation in ceiling, new house lights, increasing heating & air capacity, Lobby and bathroom areas on both sides will be totally remodeled. The Mezzanine on second floor will be walled off so that storage is not visible and so that it will be restricted from students during athletic events. Audio, video and lighting will be put in, so we can have church in the gym.

 

Phase 2 – Locker rooms upstairs and down, new basketball courts (after we are done using the gym for Church services), motorized bleachers, updated weight room.

Q: Regarding Future Phases…Will future phases be back to back with Phase I?
A: It will be determined by the growth of the Church. If it is necessary, there is a possibility of that happening, but we cannot promise anything for sure. We are now focusing on Phase I.

Q: Regarding Bridges Building…Since there will be no individual classrooms in the youth area, how will they break into groups for different classes?
A:There has been discussion and input from Bill Crockett and the teen workers. The plan is to use the Keyes building classrooms and fellowship hall, since after the renovations, that area will no longer be occupied withchildren’s classes.

Q: Handicap concerns with Theater seating & restrooms
A: The lady’s restrooms will be ADA compliant. As far as seating, we don’t have specific rows and sections decided yet because we are not far enough along in the project to answer that specifically. It’s being designed in mind of those with limitations and handicaps. There will be theater/stadium seating and there will be more space for movability than what we currently have between the pews as well as more space in the aisles. One of the advantages of the new seats are that they pop up automatically when someone moves. He assured that there will be more handicap seating than we currently have in the auditorium.

Q: Is the seating going to be tighter since we will be walling off part of the auditorium?
A:He commented that less rows will not be an issue, because with defined seating space, research shows that people are more willing to sit closer to someone if they have their own defined seat. The seats will be 23” wide. Also, if there are armrests, they will be movable. Additional Information: Pastor Robby mentioned that the handicap accessibility into the gym will be addressed as well.

Q: - What is the seating footprint in the Auditorium?
A:1500 seats in Auditorium

Q: Will seats have dual armrests?
A:First, we are not far enough along to know yet if we will have armrests on the seats. Second, to my knowledge there are not seats available with dual armrests. He expressed that he will ask about the armrests in his next meeting.

Q: Is the Sound Room going to be upstairs where it is now?
A:It will still be in the balcony, but it will be reconfigured where the sound system will be at the level of the first section of seating next to the current sound room. Lighting, projection, video and livestreaming will also all be controlled in that same area.

Q: When we move into the gym for the renovations, is it a fact that we are going to do two services? Have you considered streaming into the Garland Room?
A: Due to the very limited space in the gym, it is very likely that we will have to do two services and we are trying to prepare everyone for that possibility.

Q: How long will we be in the gym?
A:They are telling us to prepare for 12-months.

Q: If we go to two services, how will that affect SS classes?
A:SS would be in between the two services. If we go to two services, everything will change, and everyone must choose a service they will attend.

Q: Will Sunday evening services be in-home, or can we use the Garland Room like we do on July 4?
A:Currently the Garland Room will not hold a Sunday night crowd. Likely but not definite is, we will do something that is a combination of in-home meetings and some services at the church. The gym will be used from time to time for select Sunday night services, but we cannot use it every Sunday night because logistically it cannot be torn down in a timely manner to serve the School the next day. We don’t have it fully worked out but there will have to be some compromises made.

Q: Are we doing the Gym first and then the Auditorium?
A:If church votes yes, this will mean we will proceed by March 1 to get permitting started with the City. The work will start on the gym after VBS is completed.

Q: What is the capacity in Bridges Building?
A:The capacity is 200 and would not accommodate a Sunday night crowd.

Q: Will early and late services have childcare?
A:There will be childcare at both services.

Additional Information:

Pastor Robby asked for East Wing, first floor diagram to be shown on the screen so he could make a comment. He pointed out the nursery area (children check-in area, play area) on the screen and mentioned that there would be construction going on in there, and that we don’t know to what capacity that we will be able to use the East Wing, so there is a possibility that we may have to relocate the nurseries over to the preschool building. This will require extra set up and tear down as well.

Q: If Gym work doesn’t start until June, what is the risk that GCA will be able to use the gym whenschool starts in the fall?
A:There is a possibility that it won’t be ready and I’m sure we will have to play some games at a neutral site. We have discussed the idea of prioritizing the work so that the courts would be done first so that they can at least use them for games even if other things weren’t completed.

Q: Are we going to lose parking spaces during the construction?
A: Yes, we will lose parking spaces during construction, but we know we will have enough space to park, it just may not be as convenient as usual.

Q: What proposals are being made as far as improving the heating and cooling systems?
A: On both buildings everything will be brand new.

Q:Are they proposing a different type of system?
A:The original plan was to leave the original plenums and duct work and only replace our air handlers and condenser units outside, but the City said that will not work since we are changing so much of the footprint of the building, and they are requiring a system that is constantly pulling in outside air. He asked Bill Oats to expand with his expertise in air & heating.Bill Oats explained that when you go over a 5-ton system you must introduce fresh air. Anytime you remodel, air & heating systems must be brought up to code.

Q: Is the heating system electric in this building (Auditorium)?
A:Yes, the current system is 80-tons of A/C and heating.They suspect that with the new A/C units, insulation, lighting and roofing, we could save about 70% in energy costs. Pastor Robby mentioned that it currently costs $700 an hour to heat the building.

Q: Regarding Choir & Orchestra practice rooms – will they try to have those rooms on the same AC/Heating system?
A: They will be on separate systems

Q:Will we still be able to use the same condenser we just recently put in?
A:Yes, that is my understanding.

Q:Where is the Maintenance Shop going to go when the Bridges Building is renovated?
A: When the renovations take place, two of the classrooms in the Gideon Building will be vacated and the Maintenance Shop will temporarily move into that space. In a second phase of this Master Plan, the Maintenance Shop will be built that has a loading dock and all that they need to function. Two possible locations are either where the Gideon Buildings are right now or where the Tractor Shed is located.

Q: How many people do you anticipate will vote?
A:Though I don’t know how many people will show up, I would say around 500 adults. There are more than 500 members in good standing, I am just guessing from a normal Sunday that there will be about 500 here to vote.

Q:How many units of financial supporters do we have?
A:There are 600 giving units in our church, of those 600 units, about 300 units are who really carry the church. A giving unit (by typical church standards) is someone who gives $250 or more in a year. About half of the giving units are approx. giving $250 - $2500 in a year. The Core of the church are givers who give $2500 or more a year and that is currently about 300 giving units. We will approach everyone to prayerfully consider giving, even our mail-in offering supporters. The total project will require that we have at least 1.2 million committed to give over the next 3 years. We anticipate going into two, back to back stewardship campaigns to raise money, and then we will finance the remaining balance on a 15-20-year note. Our goal is to pay it off in 6 years.

Q: What is our General Fund giving in a year?
A: Our General Fund giving is 1.6 million in a year, our total giving is over 2.3 million. We would not move forward with this unless we had an additional 1.2 million spread out over 3 years.

Q: When we tell the architects that we are ready to go, how are the upfront costs going to be handled?

A:If the Church votes yes on February 18, the Public Phase (challenge our people to give) of Stewardship Campaign will begin in April and May. Commitment Sunday will be Sunday, May 6. Then on Sunday, May 20, we will have our First Fruits Offering. At that point, we should have money coming in regularly from May – December, and going by data that we have collected from stewardship company as well as other churches, that money should be more than enough to start construction documents that need to be prepared and will also be enough to pay for the gym. Early next year when we begin the heavy-duty construction, whatever we are taking in in the Reimagine Offerings will go toward the project. When the billing starts, we will take out a construction loan. Monies will go to the contractor from both the church and the loan. In other words, we are looking at a 5 million-dollar project but there will not be a 5 million dollar note.

Q: Where are they relocating the AC units on the north side of the East Wing?
A:They will put them on the roof of the East Wing. Further than that, the goal is to put everything on the roof and skirt it so that it is not visible. *visual on screen was used for clarification*

Q: What is projected time for gym to be done so we can move in there?
A:I don’t want to give a number, but we know it can easily be done before we need to move into it.

Q: Has thought been given to how the normal operating budget will be affected when we have to hire additional part time workers?
A:It has been factored into construction costs.